Modify Work Order Numbering Sequence
Whenever a new Work Order is generated, the Work Order number is automatically chosen based on a numerical sequence. For example, if the Work Order sequence is set to 1000, the next Work Order created will be numbered 1001.
Maintenance Pro has the ability to change the Work Order sequence if a higher value needs to be pushed.
Note: once the Work Order sequence is moved forward, it cannot be reverted back to a lower number. The sequence also cannot contain any letters or symbols. It can only contain numbers.
To edit the Work Order sequence, click the gear and choose Organization Profile. Click the tab for WO/PO Sequences and set the Work Order Sequence value to your desired setting.
Click Save on the bottom to save the setting.